Anvil completed the design of a Coke Drum Replacement project for a Washington refinery. Anvil worked closely with the constructor to develop rigging concepts and a lift plan to remove the four existing 26-foot diameter coke drums and replaced them with new 27.5-foot diameter coke drums. The designed structural steel changes allowed the drill deck and 4 derricks to be lifted in one piece.
2000