2002

Anvil revamped an existing FCCU by upgrading the Regenerator Cyclone System and increasing the regenerator’s tangent length by 10 feet. The project also removed and replaced all refractory in the regenerator and replaced the Flue Gas Line, including the expansion joint. This was one of our first major FCC projects and started building our reputation for FCC revamps.